Scope of Work: Address localised road flooding by installing interconnected soakwells and a new catch pit to ensure effective water conveyance and storage.
Project Limits: Adjacent Sami Bitumen Technologies, lot 108 Port Road, Kwinana Beach
Objective: Provide adequate drainage of the road surface water runoff to prevent flooding.