The existing pavement surface is in a severely deteriorated condition and requires resurfacing. The scope of works includes the removal of the existing kerb and installation of new kerbs to meet current standards, reprofiling of the surface, and placement of new stone mastic asphalt. Verge areas will be reinstated as necessary during construction.